At this point, when the building is sheathed, and doors and windows are installed, the subcontractors doing the electrical and plumbing work may now arrive to begin the rough-in portion of their job. It is also a job some homeowners can tackle. Install the windows, doors, and skylights: Usually, this will be done by the same carpentry crew that did the framing, though sometimes a manufacturer's crew will come in to do this work.The basic sheathing of the wall and roof surfaces concludes this stage. The rough openings for windows, doors, and skylights will be framed at this time. When good weather arrives, the carpenter crew arrives to frame the house walls, including the floor, ceiling, and roof skeleton: Framing is the basic shell of the house, minus siding and roof surface.Work up a framing order of needed lumber, nails, builder's felt or house wrap, and adhesives, based on your building plans.The Spruce Home Improvement Review Board.